LORELEY
REFURBISHMENT AND CONVERSION
builder
City of St Goarshausen
architect
ASP Architects, Stuttgart
Period
2012 to 2017
Services
Structural design of the roof and building, technical processing (statics plans), construction supervision: The Loreley open-air stage, which is getting on in years, is to be adapted to today's event needs. The stage will be covered with a new steel membrane structure and the entrance and backstage areas will be redesigned.
Share by: